Calculate the volume of fill required to decommission and level a swimming pool.
* Calculations include a 30% bulking/compaction factor. Every site is different — get a precise assessment.
Removing a swimming pool is more complex than simply filling a hole with dirt. Without proper methodology, the backfilled area can suffer from severe subsidence, rendering the land unsuitable for future landscaping or construction.
Proper pool decommissioning requires punching holes in the shell to ensure drainage, removing the top layer of the coping, and then backfilling with clean, structural fill. Crucially, this fill must be mechanically compacted in layers (lifts) to achieve the required density.
This calculator provides an estimate of the bulk volume of fill material you will need. Keep in mind that loose fill compacts down, meaning the delivered volume must be greater than the final void volume.
Calculators provide indicative estimates. Engage our pre-construction team for an engineered methodology and a formal quotation based on your exact site constraints.