Basement excavation under existing Inner West dwellings is some of the most technical digging in Sydney.
Utility infrastructure removal in Inner West follows a strict isolate-verify-remove discipline. Redundant substations, mains, tanks and pump stations around Balmain and Newtown are decommissioned with the asset owner, proven de-energised or purged, and then removed with the surrounding network protected throughout.
We underpin and excavate beneath terraces in Balmain and Ashfield, at times removing spoil by conveyor through the front door because there is simply no machine access.
Every dig near party walls runs with movement monitoring, staged excavation cells and shoring designed before the first bucket of soil moves.
Our utility infrastructure crews operate throughout Inner West, including Balmain, Newtown, Marrickville, Leichhardt, Ashfield and surrounding areas, under Inner West Council.
Dedicated local pages for utility infrastructure in each Inner West suburb:
Engage our pre-construction team to review your Inner West utility infrastructure requirements and prepare an engineered methodology and itemised quote.