
Port Kembla built the Illawarra, and dismantling its redundant heavy infrastructure is work we're purpose-equipped for.
Site remediation in Wollongong deals with what past land uses left in the ground. Around Port Kembla and Fairy Meadow, we excavate impacted soils under environmental controls, track every load to lawfully licensed facilities, and validate the excavation so redevelopment can proceed with clean documentation.
We drop and process large steel portal frames, mill buildings and plant structures around Port Kembla and Unanderra, directing recovered steel into the recycling chain where practical.
Decades of heavy industry leave complex hazmat profiles — asbestos, SMF and contaminated dusts are surveyed and removed under controls before structural demolition begins.
Our site remediation crews operate throughout Wollongong, including Port Kembla, Fairy Meadow, Thirroul, Unanderra, Dapto and surrounding areas, under Wollongong City Council.
Dedicated local pages for site remediation in each Wollongong suburb:
Engage our pre-construction team to review your Wollongong site remediation requirements and prepare an engineered methodology and itemised quote.