
Basement excavation under existing Inner West dwellings is some of the most technical digging in Sydney.
Road infrastructure works in Inner West remove and recycle the old corridor — profiling and lifting pavements, breaking out kerbs, medians and islands, and clearing redundant furniture. Around Balmain and Newtown, waste leaves in smaller-wheelbase trucks on booked load-out windows to suit restricted street access.
We underpin and excavate beneath terraces in Balmain and Ashfield, at times removing spoil by conveyor through the front door because there is simply no machine access.
Every dig near party walls runs with movement monitoring, staged excavation cells and shoring designed before the first bucket of soil moves.
Our road infrastructure crews operate throughout Inner West, including Balmain, Newtown, Marrickville, Leichhardt, Ashfield and surrounding areas, under Inner West Council.
Dedicated local pages for road infrastructure in each Inner West suburb:
Engage our pre-construction team to review your Inner West road infrastructure requirements and prepare an engineered methodology and itemised quote.