
The metro area's industrial past still surfaces in warehouse conversions and redundant plant tucked behind city frontages.
Asset recovery turns a Sydney Metro demolition liability into partial cost recovery. Before structures drop, we identify and extract saleable plant, switchgear, structural steel and equipment from sites around Surry Hills and Pyrmont, crediting recovered value against the demolition contract.
Older buildings around Ultimo and Redfern frequently hide machine bases, ammonia plant rooms and buried tanks from their industrial days. We test, decommission and remove these under controlled conditions before general demolition proceeds.
Because there is no lay-down space in the city, dismantled steel and plant is cut to truck-size sections and loaded directly, with each movement slotted into a booked kerbside window.
Our asset recovery crews operate throughout Sydney Metro, including Surry Hills, Pyrmont, Redfern, Ultimo, Chippendale and surrounding areas, under City of Sydney.
Dedicated local pages for asset recovery in each Sydney Metro suburb:
Engage our pre-construction team to review your Sydney Metro asset recovery requirements and prepare an engineered methodology and itemised quote.