
Kurnell and Taren Point carry the Shire's industrial weight — older plants and warehouses ready for their next use.
Asset recovery turns a Sutherland Shire demolition liability into partial cost recovery. Before structures drop, we identify and extract saleable plant, switchgear, structural steel and equipment from sites around Cronulla and Caringbah, crediting recovered value against the demolition contract.
We strip and demolish industrial buildings on the Kurnell peninsula, where large-format asbestos roofing may require assessment and controlled removal before structural work.
Contaminated soil is a frequent companion on these sites; our remediation crews excavate, track and validate so redevelopment isn't held hostage by the ground.
Our asset recovery crews operate throughout Sutherland Shire, including Cronulla, Caringbah, Sylvania, Engadine, Kurnell and surrounding areas, under Sutherland Shire Council.
Dedicated local pages for asset recovery in each Sutherland Shire suburb:
Engage our pre-construction team to review your Sutherland Shire asset recovery requirements and prepare an engineered methodology and itemised quote.